The house is still a wreck and not ready for us. What was supposed to be a two bedroom, two bathroom, and kitchen living situation has turned into a one bedroom, partial bathroom, and no kitchen living environment. With no kitchen and barely a bathroom, we are considering moving in with a very nice and tolerant friend of ours for a few weeks!
The good news is that the floors have been finished (but not stained) and the guest hall bathroom is coming together...
![]() |
Repaired hardwoods in kitchen. Used to be vinyl- YUCK! |
Just took this picture yesterday and we are supposed to use it tomorrow! |
We also received our kitchen cabinets and appliances; however, they still reside in the living room...
![]() |
Cabinets in the living room- NOT where they should be! |
With all of the progress, we unfortunately came back from the Holiday to find out that the basement had to be dug up as the drainage system was constructed in the wrong direction! I think we are immune to these hiccups at this point.
Our moat |
Hera likes the holes! |
Many of the holds up are based around the Inspector not coming before the Holiday as planned. Our contractor is working hard to get them in there as soon as possible but we are at their mercy. Until the Inspector comes, they can't finish the master bathroom or kitchen.
We have high hopes the Inspector will come by the first week of January and the remaining renovations will progress at a swifter rate!